What kind of work should I prepare before installing the sublimated jersey machine?

The purchase of sublimated jersey machine, the installation of the machine, after-sales service is indispensable part of the machine, the after-sales of the machine is not only value-added services, but also an important measure to establish brand reputation. So what are the advantages of FeiYue sublimated jersey machine manufacturers in the after-sales service of the machine?

 sublimated jersey machine

(1) Before our installer arrives for four hours, it must be confirmed that the rotary heat transfer machine needs to be placed and that the ground is flat and free of debris.
(2) Prepare the 380V power and installation wires (10 square wires) required to install the machine.
(3) Book the forklift required for unloading. If you need to go upstairs, book the crane in advance, and confirm the crane purchase window in advance. If you need to open the window, please arrange it in advance.
(4) Arrange 2-3 staff members to cooperate with our installers.
(5) Inform the machine operator or master in advance to wait for our installation personnel to conduct training on their operation and safety matters; study carefully during the training.
 sublimated jersey machine

The above 5 points are the preparations for the installation of the FeiYue printing mechanical roller printing machine. If you have other requirements, please contact FeiYue Printing Machinery at 86-025-86628894 and we will be happy to help you within 24 hours.

More info:
Tel: 86-025-86628894
Whatsapp: +86 18851084450
E-mail: janezhang940213@gmail.com
Website: www.skyimagepaper.com
Company Name: Fei Yue Digital Technology Co.,LTD
Address: Central Road 323, Nanjing, Jiangsu, China

评论

热门博文